Turbine Inlet Air Cooling of two MGT80 at South-II CCPP

Turbine Inlet Air Cooling of two MGT80 at South-II CCPP

Client: MAPNA Group Plant Owner: Mobarakeh Steel co. Location: Isfahan, Iran. Project Duration: 9 Month Scheduled Commissioning Date: Aug. 2023 Scope Of Work: EPC of Upstream Media Cooling system for two MGT80 GTs, each one with nominal Power of 308MW. Status: under construction . . Keywords: Upstream Media Cooler, Upstream Evaporative cooler, Upstream system, Media Cooler, Turbine Inlet Air Cooling system […]