Media cooling system for 2*V94.2 GTs of Zagros Power Plant

Client: Zagros Kowsar Power Generation & Management co

Location: Kermanshah, Iran

Commissioning Date: June 2020

Scope Of Work: EPC of Media Cooling system for two V94.2 GTs.

Results:

The performance test shows more than 20 degrees Celsius temperature decrease due to operation of Media system, which result in 15% power increase of each GT at the design point.

Video clip of the Project